In order to meet the challenge of growth the fabrication facility has been extended from 450m² to 1080m² complete with additional overhead gantry cranes.
The Company continues to consider the addition of a second covered, enclosed construction hall over the existing slipway measuring 70x25m, with a 5t overhead gantry crane with 11m under the hook at the lowest point.
